Prequalification Announcement Bidding for Refinery Development Master Plan (“RDMP”) Project of RU V Balikpapan
PREQUALIFICATION ANNOUNCEMENT
Bidding of Engineering, Procurement and Construction (“EPC”)
Submarine Pipe Line (“SPL”) and Single Point Mooring (“SPM”)
for Refinery Development Master Plan (“RDMP”) Project of RU V Balikpapan
No. 001/SPL-SPM/RDMP-RP/2017
PT Pertamina (Persero) will hold Prequalification (“PQ”) in accordance with SK Direksi Pertamina No. Kpts-043/C00000/2015-S0 dated 8th October 2015 and/or its amendment of Sistem & Tata Kerja Pengadaan Barang/Jasa at PT Pertamina (Persero), as follows :
I. Project Informations :
Project Title |
: EPC SPL and SPM for RDMP Project of RU V Balikpapan. |
Location |
: Lawe-Lawe, Refinery Unit V Balikpapan, East Kalimantan, Indonesia. |
Project Scope |
|
- Procurement and installation of SPM Calm Buoy system with capacity 320.000 DWT with depth 32 m including PLEM,
- Procurement and installation of SPL:
- 60 inch (including 4 inch concrete coated) with length ±14 km
- 23,14 inch (including 40mm concrete coated) with length ±4,5 km
- Procurement and installation of onshore pipe line:
- 52 inch with length ±7 km
- 20 inch with length ±14 km
- Corrosion protection system and pigging facility
- Procurement and construction for onshore facilities:
- 2 crude oil tank with capacity @ 1 million barrel, 2 crude transfer pump with capacity 665 m3/h
- Raw Water Unit consists of 3 water deep well capacity 40m3/h, aerator holding tank, chemical system, sand filter and Demineralizer Water Unit consist of softener unit capacity 7m3/h & polisher unit
- Fire Water System & WWTP Unit
II. PQ Participant
Companies to participate in PQ shall form Consortium that shall meet requirements set out in PQ Document with the following structure and requirements:
Position
|
Administrative
|
Financial Performance
2015or 20161
|
Technical2
|
Net Worth
Eqv. USD
|
Financial Health Score
|
Leader
(mandatory)
|
Overseas:
Domestic / National:
- SBU integrated construction services
- IUJK
- SKT MIGAS
|
Minimum 75 Million
|
Minimum “60”
|
- Having project experiences within 15 years since 2001 for EPC SPL & SPM Installation:
- SPL, OD = min. 42 inch, length = min. 20 km, depth = min. 32 m
- SPM with capacity min. 250.000 DWT
- Having owned lay barge with min. spec.:
- Tensioner capacity 100 MT
- Pipe size capacity 60” OD
- Mooring system 10-pt anchors
|
Domestic3 member
(mandatory)
|
- SBU integrated construction services
- IUJK
- SKT MIGAS
|
Minimum
15 Million
|
Minimum “60”
|
Having project experiences within 15 years since 2001 for EPC Oil & Gas / Petrochemical project with contract value min. USD 15,000,000.-
|
National4 member
(optional)
|
Overseas member
(mandatory)
|
|
Minimum
75 Million
|
Minimum “60”
|
Having project experience within 15 years since 2001 for EPC Crude Oil Tankage Project with capacity min. 1 million barrel per tank.
|
Note :
Detail requirements of administration, financial and technical set out in PQ document :
- Interim, audited by PricewaterhouseCoopers (“PwC”).
- Shall be proven by copy of contract and handover certificate.
- National company : share not fully 100% owned by Indonesian or Indonesian Government.
- Domestic company : 100% share owned by Indonesian or Indonesian Government.
III. PQ Process Stage
No.
|
Activity
|
Schedule
|
Description
|
Document Required Comply to Point II
|
1.
|
Registration
|
30, 31 January 2017 &
1, 2, 3 February 2017
Time:
08.00 AM – 11.30 AM & 01.30 PM – 04.00 PM
(Jakarta Local Time)
|
Performed by single company
|
- Copy of contract and Handover certificate of project experiences.
- Audited Financial Report of 2013, 2014 and 2015.
- Statement letter as required*)
|
2.
|
PQ Explanation
|
6 February 2016
Time:
08.30 AM – finish
(Jakarta Local Time)
|
Attended by companies who have received PQ document
|
Original PQ Document.
|
3.
|
PQ Response Preparation
|
Will be discussed during PQ explanation
|
-
|
PQ document response prepared in accordance with PQ requirements.
|
4.
|
PQ Response Submission
|
Note :
- Personnel who perform registration, attend PQ explanation and submit PQ response document shall be equipped with power of attorney of authorized personnel.
- Place of Registration, PQ Explanation, and PQ Response Submission :
PT Pertamina (Persero) Refining Project Office - Patra Office Tower,
14th Floor, Jl. Gatot Subroto Kav. 32-34 – Jakarta.
*) Statement letter signed by Director of the Company stating that:
- The Company is not under the supervision of a court or legal institution, not bankrupt, not being suspended in business activities, and / or Directors of the Company authorized to sign contracts or their proxies are not serving a sentence (penalty) offense;
- The Company is not in dispute either inside or outside the court / Alternative Dispute Resolution with PT Pertamina (Persero);
- Directors of the Company authorized to sign contracts or their proxies have not been convicted by a judgment of the actions related to company performance or individual professional on procurement of goods / services;
- Not being exposed to the auction and participate restrictions (include, but not limited to complete project or on-going project in delay) or not included in the list of sanctioned companies pursuant to SK Direksi Pertamina No. Kpts-043/C00000/2015-S0 dated 8th October 2015 and / or its amendment;
- Companies in different consortium are not having affiliation that has same majority shareholders / majority share owners or same member of Board Director or Commissioner, except for State Owned Companies (BUMN).
BID COMMITTEE OF RDMP PROJECT - RU V BALIKPAPAN
PT PERTAMINA (PERSERO)